We have been very busy the last few months so have not had time to do much work on the Escort project or updating the blog. Here are some photos that we have taken recently showing where we are with the build:
Droping in the Millington Diamond engine
The Quaife 60G 6 Speed Sequential Gearbox. Also bolted in the new Motamec Vertical Hydraulic Handbrake
Plumbing in the AH Fabrications dry sump tank with -12 Motamec oil hose and fittings
The Lifeline Zero 2000 Plumbed in Fire Extinguisher system, FIA approved, 4 Litre bottle
Running the lines, Motamec -12 oil, -6 fuel and -3 brake